Aluminium, timber & reinforced concrete: hybrid construction project on Lake Ammersee

“To succeed as an architect, you need a theme that resonates locally. In Utting, people responded strongly to timber construction in a natural setting,” says architect Gerold Heugenhauser. Together with project manager Patricia Ezcurra, he delivered the new residential development on the Schmucker site in Utting on Lake Ammersee. They designed six building volumes for the 13,000 m² plot, comprising 25 houses with monopitch roofs, arranged in a staggered formation. The project is a real success in urban-planning terms: anyone looking at these buildings would never guess that they provide almost 9,000 m² of floor space above ground.

Hybrid timber construction with an aluminium roof
The groups of houses were built in hybrid timber construction over five construction phases between January 2021 and December 2022. This means that the roofs, ceilings and walls are made of timber, while the lift shafts, stairwells and basements are made of reinforced concrete. This choice of materials at structural level is matched by a pared-back colour palette on the exterior: pre-weathered spruce and dark grey PREFA R.16 roof tiles set the tone. All junctions, windows and balcony railings, as well as the fire-resistant panels in the façades between floors, were finished in the same dark colour as the aluminium roof.


A focus on efficiency
“PREFA came onto our radar when the timber construction company built the first façade mock-up. We liked the material straight away, also because PREFA can supply all the necessary junctions and components for roof drainage. It was an excellent fit for the concept of the residential development,” says Hegenhauser. The 2,950 m² roof area was clad with PREFA roof tiles. “The colours are perfectly coordinated, giving the different building volumes a clear sense of unity,” adds Patricia Ezcurra.


Learning as they went, house by house
Installing the roof covering was a major undertaking, carried out by Dachdeckerei Urban. The R.16 roof tiles, together with PREFALZ in P.10 dark grey and matching PREFA roof drainage, were installed in successive construction phases. As the team gained valuable experience with the roof junctions on the first house in the new development, the next houses in the project began to take shape.
“It was a very interesting project for us,” says owner Oskar Urban enthusiastically. “With each house and each roof, we were able to further refine our way of working.” For this project, Urban’s company took care of the entire substructure for the monopitch roofs, as well as their edge details, the junctions with the stairwells and lift shafts, the installation plates for roof penetrations and the external rainwater drainage for all the building volumes.

Unaffected by temperature
Work on site continued through the winter to ensure the project was completed on time. Aluminium has the advantage that it can be processed and installed regardless of the temperature. “We worked on Lake Ammersee from around October 2021 to November 2022,” explains Urban, standing beside a large project drawing in his office. A well-considered, pragmatic schedule was drawn up in consultation with the architect and main contractor. Urban’s credo is simple: buildings must serve their purpose, and roofs must be watertight.


A business enquiry for PREFA? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeCircular construction and material awareness
- SubjectProjects
- CompanyPREFA