Insulation as the link between design and construction

Text Kris VandekerckhoveImage Wout Goeminne

Insulation as the link between design and construction

A new fire station in Bruges and timber-frame walls at Nieuw Zuid in Antwerp: two construction projects in which insulation must meet several requirements at once. Alongside thermal and acoustic properties, fire safety, weight, dimensions and site logistics all play a part. URSA offers a tailored solution for each project, with WALLTEC BLACK and FRAMETEC 32 respectively. Contractors, dealers and the manufacturer explain how the choice was made and what it means on site.

Choosing insulation starts with the building’s requirements. The material must fit within the construction, work with the other components and be straightforward to install. The specified thermal performance is one criterion. Installation conditions, available space and coordination between the construction partners also determine which solution is suitable.

In Bruges, this assessment led to façade insulation that meets specific requirements for thermal resistance and non-combustibility. At Nieuw Zuid, the focus is on the relationship between the lightweight frame, the insulation and the sheathing. Both projects show how the building application informs the choice of material.

Isolatie als schakel tussen ontwerp en uitvoering

Bruges: a fire station for work and rest

The new fire station on Dirk Martensstraat, in the Waggelwater industrial estate, will be both the home base for the Bruges fire brigade and a central base for Hulpverleningszone 1 West-Vlaanderen. Its location near Bevrijdingslaan should enable the fire service to reach incidents in its response area more quickly.

Alongside its operational role, the station must provide a pleasant environment for staff who spend long shifts there. “A comfortable working and resting environment is very important,” says Adjudant Laurence Deman, coordinator of the Bruges and Ruddervoorde fire stations. “We work 12-hour shifts, including at night. It’s nice to be able to spend that time in a homely atmosphere.”

Thermal and acoustic comfort are therefore closely linked to day-to-day use. They contribute to the quality of a building where staff prepare vehicles and equipment, work and rest.

Isolatie als schakel tussen ontwerp en uitvoering

Several requirements, one material choice

Kim Joos, Sales Representative Regio West at URSA: “URSA WALLTEC BLACK was chosen for the façade insulation. This dimensionally stable mineral glass wool board has a black, weather-resistant glass fleece facing on one side. The product is suitable for ventilated façades and cavity walls and has a declared thermal conductivity of 0,032 W/m·K. The board is also non-combustible, with a reaction to fire classification of A1.”

Ruben Defoort, site manager at Artes, explains that the specification brought together several requirements. It called for an R-value of 5,15 m²K/W, as well as non-combustibility and an environmental requirement for the insulation. WALLTEC BLACK emerged as a proposed solution in consultation with Isobuild. Price also helped tip the balance.

According to Jürgen Teerlinck, account manager at Isobuild, particular attention was required because of the building’s height, the long period the insulation would be exposed during construction and the specification’s requirements. The conditions the insulation would be exposed to before the final façade finish was applied also informed the choice.

Isolatie als schakel tussen ontwerp en uitvoering

Deliveries keep pace with the site

Isobuild supplied a total of 2.869 square metres of WALLTEC BLACK for the Bruges fire station. The bulk of this was 2.620 square metres at a thickness of 180 millimetres. A further 125 square metres at 140 millimetres and 124 square metres at 60 millimetres were supplied. These quantities called for deliveries to be aligned with progress on site. Teerlinck therefore emphasises the importance of good communication between the site management team and Isobuild’s internal sales team. In this way, the dealer links material advice with the practical coordination of deliveries to site.

Isolatie als schakel tussen ontwerp en uitvoering

Nieuw Zuid: insulating within a lightweight structure

At Nieuw Zuid in Antwerp, Renisol is installing non-load-bearing timber-frame walls as part of a project by developer Triple Living, with Hooyberghs as main contractor. The walls will use a total of 3.311,52 square metres of URSA FRAMETEC 32, in thicknesses of 140, 200 and 240 millimetres.

Tom Van Doninck of Renisol explains that the insulation in these walls serves both an acoustic and a thermal function. The material’s weight is also a factor. “We need to try to keep the system as light as possible.” In his view, the combination of low weight, thermal properties and fire safety makes FRAMETEC suitable for this project. FRAMETEC 32 is an unfaced mineral glass wool roll for timber- and steel-frame construction, with a thermal conductivity of 0,032 W/m·K. The range includes widths specifically designed for frame construction.

Isolatie als schakel tussen ontwerp en uitvoering

Dimensions support installation

Annemie Cleijnen, Sales Representative Regio Oost at URSA, explains how these dimensions simplify installation. The insulation can be cut to a specific width at the factory to suit the frame it will fit into. If the dimensions are right, installers do not need to adjust the width again on site. This reduces cutting and the associated material waste.

It therefore pays for designers and contractors to coordinate frame dimensions and insulation format early on. The frame layout also determines how much adjustment installers will need to do. The right dimensions make work on site easier.

At Nieuw Zuid, preparation also involves more than just the insulation. Cleijnen points to the choice of sheathing, the fire requirements and the availability of the necessary certificates. The assessment covers the entire wall build-up: the insulation’s properties need to be considered alongside the other components and the performance required of the assembly as a whole.

Isolatie als schakel tussen ontwerp en uitvoering

Sharing technical knowledge all the way to site

Houtbedrijf Lavrijsen supports the project as dealer and supplier. Tim van Gorp says the company has been involved since the tender enquiry, reviewing the required technical properties with particular attention to fire safety. To provide the contractor with targeted support, Lavrijsen draws on the product knowledge of URSA, which it has distributed for many years. Each party contributes its own expertise. Renisol knows the installation process and the key considerations on site. Lavrijsen translates the requirements into material advice and supply. URSA provides support based on the product’s properties and applications.

Both projects show how insulation must work as part of the complete construction and installation process. Thermal performance, fire safety, weight and dimensions together determine the choice. With WALLTEC BLACK for the Bruges fire station and FRAMETEC 32 for the timber-frame walls at Nieuw Zuid, URSA provides a tailored solution in each case, supported by close consultation with the dealer and contractor.

Isolatie als schakel tussen ontwerp en uitvoering
Isolatie als schakel tussen ontwerp en uitvoering
Isolatie als schakel tussen ontwerp en uitvoering

Have a business enquiry for URSA Benelux? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeBuilding envelopes for a changing climate
  • SubjectProjects
  • CompanyURSA Benelux
Share this article

Follow on ArchiComm Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.