The pen

Designing for the future

Aline Vergauwen
Aline Vergauwen

Over the past five years, there has been plenty of experimentation and knowledge-sharing around circular construction in Flanders. It was a pleasure to see so many enthusiastic and committed professionals at work during the action days of the Green Deal Circulair Bouwen and on the many projects run by Vlaanderen Circulair. At Buildwise, I have also had the opportunity to support and guide many pioneering professionals in the sector as they put circular principles into practice. 

The big question now is how we can scale things up. How do we bring everyone on board? I am very curious to see whether the EU Taxonomy will deliver the expected (and necessary) push in 2024. Large companies, such as major property developers, manufacturers, banks and insurance companies, will be required to report on their sustainable activities. They will in turn impose this requirement on companies in their value chains. The vast majority of construction and building services companies and architecture practices will therefore not be directly affected by the taxonomy, but may be affected indirectly. To what extent will the ‘circularity criteria’ included in the taxonomy filter through to the drawing board and into specifications? And if they do, will architects be ready to provide answers? 

As an architect, you will need to learn to design for the future, based on possible scenarios, rather than for specific needs today. That means leaving less of your own mark and giving future owners or users more freedom to make changes. Of course, you cannot anticipate every possible future change, but a number of smart design choices can give a building a longer lifespan. The choice between demolition, renovation and conversion often comes down today to ceiling heights, the structural concept, space for building services, the scope to alter the floor plan, and so on. I believe architects need to be more aware of this responsibility. 

As an architect, you will also need to pay more attention to standardisation. This helps ensure that building components have greater potential for reuse in the future. And as manufacturers take on more responsibility for the second life of their products, through reuse or recycling, they will set requirements for how their materials are used. Construction solutions will therefore increasingly be offered by the market as ‘complete solutions’, with standard dimensions or specific connection methods, rather than being devised at the drawing board. 

Finally, I see an important role for architects in using reclaimed materials in projects. Reclaimed materials have imperfections, colour variations or, at times, uncertain technical performance. By combining smart, creative design with experience in collaboration and coordination, architects can make a real difference. They are ideally placed to increase the chances of reuse succeeding in projects.

I am looking forward to 2024 and am curious to see how we, as a construction sector, can truly make the transition to a circular economy a reality.    

Aline Vergauwen, 
Dr Ir Arch, Project Manager at Buildwise

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFrom vision to built project
  • SubjectThe pen
Share this article

Follow on ArchiComm Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.