WALLTEC BLACK helps E.Rombaut insulate simply and safely against fire

Kaai33 is taking shape on the Dender in Aalst. The residential project comprises 29 homes in striking architecture. Construction is progressing in a challenging context, with sharp price fluctuations and new fire safety requirements on the horizon. WALLTEC BLACK proved to be a partner that could help the construction team meet these challenges.

Kaai 33 set to become a landmark on Aalst’s new ramblas
Together with the city of Aalst, property developer Vestra, ESTE architects and contractor E. Rombaut are writing a new chapter for the quays in the industrial city. The Kaai 33 project marks the start of the revitalisation of the route along the Dender between the city park and the city centre. To meet their sustainability and fire safety goals for Kaai 33, the designers selected URSA’s WALLTEC BLACK insulation.
Kaai 33 presents itself as a ship, just moored on the banks of the Dender. These poetic words open the project website for the new residential development. The renders leave little to the imagination and showcase solid architecture that gives the former industrial site on the Dender a strong new identity. “That was also the starting point for our design,” says Peter Flamend, architect and partner at ESTE architects. “In response to the RUP ‘Uitbreiding Stadspark’, we developed this design together with the city of Aalst. Our vision was to use the project to pay tribute to Aalst’s industrial past. This is reflected in the raw building materials, such as the red brick, the large concrete paving slabs and the metal cladding on the top floors. These top-floor boxes mark the end of the building and also serve as a landmark for people entering the city.” Kaai 33 is the first project in a new development between the city park and the centre. The city will later also redevelop the quays, with the aim of turning them into a ramblas between the city’s two main attractions.

Fire safety made simple
Kaai 33 makes an impression not only architecturally, but also in terms of sustainability, thanks to its strong energy performance and choice of quality materials. ESTE architects chose mineral wool to insulate the building envelope. “For two reasons,” explains Peter Flamend. “Firstly, sustainability: at ESTE architects, we are not keen on chemical insulation materials, which are not recyclable either. Secondly, fire safety. In response to the stricter requirements for façade insulation in the new Royal Decree on fire safety, we were looking for an insulation solution that would not require compartmentation within the external wall insulation layer. That makes it much easier to coordinate the different contractors. Hence the choice of mineral glass wool.

A good first impression
On the recommendation of building materials supplier Van Biesen: Everaert, contractor E. Rombaut chose Ursa’s WALLTEC BLACK. Site manager Gunter Vereecken has completed the load-bearing shell and is now busy installing the façade insulation and brickwork. “This is the first time I’ve worked with 18cm-thick WALLTEC BLACK,” he admits. “It’s a straightforward insulation system to install. We secure the boards with fixings. In principle, an embedment depth of 6cm is sufficient, but as 24cm fixings are currently hard to find on the market, we’re using 26cm ones. One advantage of this flexible insulation is that it adapts easily to irregularities in the load-bearing structure. With rigid insulation boards, you always have to cut them to get a perfect fit. One thing to bear in mind is that we have to protect the insulation from rain. That does worry me a little. But otherwise, my first experience has been very positive.” The insulation will be protected by red brickwork. “A striking feature is the vertical stretcher courses that finish each storey. They cover around 600m² of the total 1,800m² of brickwork.”

Buying ahead
Frederik Van Biesen clearly remembers the request from contractor E. Rombaut. “Our first discussions took place at the end of 2021. The requirements were for a sustainable material that would easily meet the new fire safety requirements and, above all, offer some certainty over a fixed price. The big challenge for us was to provide the same R-value as PIR insulation without deviating too much from its thickness,” says Frederik van Biesen. Thanks to this proposal, the supplier secured the contract for the project’s complete insulation solution, including accessories. “The contractor also played it safe by ordering some of the insulation in advance and storing it on site. That way, he was able to anticipate the current price uncertainty. We’ve been working with the contractor for several years and also keep a considerable amount of material in stock, which means we can deliver quickly.”
Have a business enquiry for URSA Benelux? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectProjects
- CompanyURSA Benelux