Improved thermal and acoustic performance are not the only benefits of the URSA TERRA range. URSA’s new mineral wool also scores highly in terms of fire safety. This did not go unnoticed by the construction team behind the Ghent residential project De Nieuwe Dokken. URSA TERRA is proving its worth at the highest level.

URSA proves itself a reliable partner in Ghent urban regeneration project
The Oude Dokken urban regeneration project is transforming the old harbour area around the Houtdok, Achterdok and Handelsdok into a brand-new urban district with around 1,200 homes, a school, childcare centre, neighbourhood sports hall, public facilities and green space. One of the developments in the area between the Muide neighbourhood and Dampoort is De Nieuwe Dokken. Both URSA and Xella are adding value to this new urban district.
The Oude Dokken has been undergoing major change since 2004. One of the projects under way is the De Nieuwe Dokken residential and community development, on the eastern side of the Handelsdok. De Nieuwe Dokken is bringing around 400 flats and houses to the former harbour area. Many of them will have views over the water. “De Nieuwe Dokken is not just another new housing project. Its concept looks beyond tomorrow and offers solutions for the sustainable neighbourhood of the future,” says site manager Frederik De Visch on behalf of contractor THV Nieuwe Dokken, a collaboration between Artes Depret, Groep Van Roey and Algemene Bouw Maes. “For example, there is a large, innovative battery system that supplies residents with electricity. A dedicated district heating network provides the homes with the heat they need. With this in mind, we are also focusing strongly on good insulation and airtightness in the various buildings.” Thanks to these measures and a well-considered approach to mobility, De Nieuwe Dokken scores 93.9% on the City of Ghent’s sustainability meter. That is an excellent result!

Acoustic excellence
With phase two under way, De Nieuwe Dokken is now operating at full speed. Following Centraalveld, THV Nieuwe Dokken is now building Noordveld. “This part of the project comprises five new buildings. We are currently constructing Pergola and Bijoux, designed by Onix architecten and Ront architecten respectively. Pergola is undoubtedly the standout building in this part of the project. The 15-storey tower catches the eye with its stepped form, built in brick and topped with a timber pergola structure. The stepped design creates space for impressive terraces. The timber accents turn the terraces into fully-fledged outdoor rooms and give Pergola a Scandinavian look,” explains Frederik De Visch.
Building at this height did, however, bring a number of considerations in terms of stability and fire safety. “A hybrid structure was devised for Pergola, combining concrete and calcium silicate elements. Calcium silicate was the preferred material because of its acoustic properties and the speed of construction. The lower floors have a load-bearing concrete frame infilled with calcium silicate elements. As the building rises, the calcium silicate elements take over the load-bearing function from the concrete,” says Filip Henderickx, project manager at Xella. While preparing the construction drawings, Xella worked with THV Nieuwe Dokken to finalise the design of the calcium silicate elements. “We did not have to make much effort here, though. The contractor and designers already had a good grasp of the principle from the first phase, where they chose a similar hybrid structure for the taller sections,” says Filip Henderickx. The BIM model was an important tool in this preparatory study. “It enabled us to exchange and check designs very quickly. It also provided a solid starting point for producing our wall drawings. This kept the pace up and the margin for error down.”

Easy-to-use insulation
The load-bearing structure of Pergola is wrapped in a warm insulating layer of WALLTEC BLACK, a dimensionally stable mineral wool slab from the URSA TERRA range. However, its excellent thermal (λ 0.032 W/m.K) and acoustic performance were not the main reasons for choosing this product from the URSA TERRA range. “Its fire-resistant properties were the deciding factor,” says Frederik De Visch. “As Pergola is classified as a high-rise building, we have to meet specific fire safety requirements, which URSA’s solution allows us to do very easily. WALLTEC BLACK is inherently non-combustible insulation. It produces almost no smoke, forms no flaming droplets and does not contribute to flame spread. This means the insulation meets Euroclass A1. It is also very easy to use. When you take a pack of mineral wool upstairs, it covers more square metres than an equivalent pack of PUR or PIR. Installation does require a little more care to ensure the edges fit neatly together, but it is still a simple job. It is also a bonus that the insulation supports the project’s sustainability ambitions.”
Verhelst Bouwmaterialen was the link between URSA and THV Nieuwe Dokken. As well as URSA insulation, the supplier provided the facing bricks and ancillary building materials for both the first and second phases. The duo of Paul Termote and Martin Willaert from Verhelst’s Knokke depot coordinated between the site, the building materials supplier and the manufacturers. Why does Verhelst have the trust of THV Nieuwe Dokken? “Because of our service and expertise,” says Paul Termote. “When a contractor orders small quantities, in many cases we deliver them to site the very next day. Large quantities come directly from the manufacturer, and we are the coordinating link that ensures the materials are delivered on the agreed date.” WALLTEC BLACK was chosen through collaboration between contractor THV Nieuwe Dokken and Verhelst. The building materials supplier also views its partnership with the insulation manufacturer positively. “A deal is a deal, and communication is very smooth,” concludes Paul Termote.
Have a business enquiry for URSA Benelux? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeBuilding envelopes for a changing climate
- SubjectProjects
- CompanyURSA Benelux