Already the project of 2024: Silt in Middelkerke. With two prestigious international awards to its name, extensive media coverage and crowds of visitors during its opening weekend, this Middelkerke venue building is a must for our series on the best of Belgian architecture. Despite the complexity, challenges and tight schedule, the team can now look back with justifiable pride on a smooth process and exceptionally swift delivery. We spoke to Guy De Meyer and Steven Maeyaert of Democo and Furnibo respectively, the contractors who worked side by side to create this new landmark and boulder-shaped beacon on the Belgian coast.
Silt Middelkerke is much more than a new events building with a casino, the only one in Belgium located on the beach. The multifunctional building, which far exceeds local ambitions, has been cleverly integrated into a redesigned landscape, creating a whole with not only economic but also ecological benefits. It also forms part of a new and essential sea defence that protects the land from the water. With a deep appreciation for the sea and dunes, this new landmark combines coastal protection, liveability and sustainability. It is a new focal point on the Belgian coast, where building and landscape merge. Reinald Top, partner architect at architecture firm ZJA, says: “The design rewrites the seaside resort’s historic relationship with the sea and, with a modest hotel tower and a relatively small footprint, adds a great deal of new public space to the site. At the same time, the hotel tower is also a striking building, with its distinctive shape and timber façade structure. Silt is understated, with maximum impact.” The project was indeed inspired by the history of the municipality. Middelkerke originated on the tidal island of Testerep and grew into a fully-fledged fishing village. Silt was intended to return that place, a symbol of Middelkerke’s prosperity at the time, to the municipality. The project has since won both an International Architecture Award and a World Landscape Award, a well-deserved accolade for the entire team.

A well-oiled construction team
There is no doubt that a well-oiled construction team was behind a project of this calibre, delivered in a particularly short timeframe. More specifically, this was construction team Nautilus, a partnership between developer Debuild, lead designers ZJA (architecture) and DELVA (landscape architecture), OZ (casino and hotel design), executive architect Bureau Bouwtechniek and contractors Furnibo and Democo. They were in turn supported by experts from COBE, VK Engineering, Beersnielsen, Witteveen+Bos, Plantec, MINT and Sertius. Did these many partnerships present a huge challenge in terms of communication and consultation? “Ultimately, it all went very smoothly.” So says Guy De Meyer, not only commercial director of construction company Democo but also at the helm of the construction team as project lead for delegated client Debuild. “It certainly helped that the design team remained involved at the implementation stage. So did the decision to involve the municipality’s responsible official closely throughout the entire execution process. This meant we could make decisions quickly.”
A dynamic contractor partnership
The scale, complexity and tight schedule meant that two class 8 contractors, Democo and Furnibo, joined forces. General contractor Democo is part of Democo Group, a group of seven construction-related companies operating in contracting, development, building services and finishing, with offices in Hasselt, Antwerp, Brussels and Ghent, and extensive experience and expertise across a range of fields.
AEW, also part of the group and specialising in electrical installations and building security, was responsible for programming everything related to fire detection and security at Silt. Furnibo, based in Veurne, also brought extensive expertise and ensured a local connection. The contractor positions itself as a leading player in the delivery of larger and more complex construction projects for the public and private sectors, with a focus on optimal collaboration. Steven Maeyaert, CEO of Furnibo, says: “Collaboration is in our DNA. We are also fully committed to the digital construction process. We believe that construction projects should be predictable, financially, technically and in terms of planning.” These were significant advantages on this project.

Lean principles
Alongside open communication, everyone’s involvement contributed to the success.
Guy De Meyer: “We also had a very good working relationship with our subcontractors. At the outset, they signed an informal charter to confirm their commitment. The charter was displayed in the site hut alongside the daily schedule. That is how you create a sense of involvement among everyone.” Steven Maeyaert adds: “At peak times, more than 500 people were working on site, which naturally required a great deal of organisation. This called for very effective coordination, based on Lean principles. The key was to keep a close eye on everything.” Guy De Meyer: “Open and clear communication is essential, of course. Not only on site, but also with local residents and neighbouring businesses. We made a point of keeping people informed even while the environmental permit application was under way, having prepared and submitted it in detail at Flemish level. Businesses along the route were invited to the site every two weeks to discuss progress. That open communication was appreciated and paid off.”
Logistical and technical challenges
Aside from the tight schedule, what were the biggest challenges? Steven Maeyaert: “During construction, logistics and access were by far the biggest challenge. We were effectively building out at sea, so it was impossible to bring materials in from the water. We also had to take account of the tourist activity along the sea wall. Only through the commitment of the entire project team did we manage to get people and materials to the right place on time.” Guy De Meyer of Democo agrees: “Once the former car park was demolished, we were left with a huge construction pit. We even built bridges across the site to get the workers to the right places.” Then there were the technical challenges posed by the unique design and distinctive architectural form. Steven Maeyaert: “Building the timber façade with its X-shaped structure, draped around the hotel building, was no easy task. The same applies to the three canopy structures, with their many unique panels fitting together like a complex puzzle. This would not have been possible without digital preparation, modern surveying techniques and 3D technology.”

Distinctive and sustainable
Sustainability was also a priority. Steven Maeyaert: “The biggest sustainability gains came from the design. Much of the building is sunk into the dune landscape, limiting its footprint and reducing the amount of façade finishing materials required. The canopy structure also prevents excessive solar gain and reduces the cooling load.” Materials were reused wherever possible. Guy De Meyer: “The rubble from the construction pit was crushed on site and used for the sub-base of the various infrastructure elements. The sand was also kept on site and used to create temporary dunes to protect the building from the advancing sea.” In terms of building services, the team opted for a system that provides thermal comfort throughout the building. Guy De Meyer: “A BEO field was not an option given the location and composition of the ground. So we chose a central system of air-to-water heat pumps combined with large air handling units in the building, with a huge duct running beneath the building to bring in fresh air.” The result? A distinctive, sustainable building, both dynamic and restrained. A landmark that is set to continue attracting plenty of attention, both in the near and distant future.
Silt in figures
• Total project area: 39,200 m² (just under 8 football pitches)
• Earthworks: 80,000 m³ (just under 1,200 large shipping containers)
• Foundation piles: 1,050
• Retaining walls:
Soil mix walls (CSM): 713 m
Secant pile walls: 275 m
Berliner walls: 400 m
• Cast-in-place concrete: 25,150 m³
• Reinforcing steel: 2,170,000 k
• Power-floated concrete: 16,275 m²
• External joinery (windows and doors): 2,950 m²
• Timber tower frame: 3,060 m of Accoya beams
• Paving: 19,000 m²
• Green space: 7,800 m²
• Printed concrete for the sea defence: 3,800 m²
• Underground car park: 354 spaces
Question about this story? Ask your question
In this story
- Project:Silt
- Location:Middelkerke
- Architect:ZJA i.s.m. OZ en Bureau Bouwtechniek
- Landscape architect:DELVA
- Contractors:Democo en Furnibo