Off-site construction to accelerate energy-efficient renovation

Efficient decarbonisation of social housing
A climate-neutral Europe by 2050? There is still a great deal to do, including tackling the energy-inefficient housing stock. In Belgium, the Netherlands, the UK and Germany alone, around 21 million social homes need major energy-efficiency renovations. Renovating all these homes using traditional methods seems unfeasible. A pilot project in France shows that there is another way, illustrating the potential of off-site construction to accelerate energy renovation.

What does off-site energy renovation involve? It starts with a digital scan and survey of the building. A new, bespoke prefabricated building envelope is then made, complete with façades and roofs. Digitalisation and automation are, of course, essential. This building envelope is fitted over the existing home like a climate jacket. This comprehensive renovation, aimed at achieving energy-neutral living, also includes the installation of measures such as solar panels and a heat pump. It is an efficient plug-and-play method that can be installed in just 24 hours, making it particularly suitable for social housing. An added benefit is that residents experience minimal disruption and do not need to find alternative accommodation during the renovation.
Wattrelos: pilot project in France
The project in Wattrelos, France, near Lille, demonstrates what is possible as part of EnergieSprong, a European organisation seeking to make large-scale energy renovation of homes possible. The 160 social homes, built in 1960, were renovated in ten months, moving from energy label F to fully energy-neutral. The Belgian start-up BuildUp played a key role. It grew out of beSteel, founded in 2018. This SME specialises in off-site construction for both new-build projects and energy renovation, and was responsible for producing the façades and roofs for the project. These were made at the workshop in Aarschot, then the assembled building elements, which are also circular and made largely from bio-based materials, were transported to Wattrelos. There, they were installed at a rate of one home per day. This is a fine practical example of what off-site construction can achieve.

European subsidy programme: Life Giga Regio Factory
The story has since taken a promising turn. The European Commission recently selected BuildUp as one of fifteen companies active in Belgium, Germany, Italy and France to form a consortium with the shared goal of facilitating the energy renovation of 750,000 social homes by 2030 using off-site-produced building envelopes. In Belgium, partners involved alongside BuildUp include Buildwise, Greenwin and Housing Europe, the umbrella organisation for social housing in Europe. BuildUp CEO Hélène de Troostembergh says: “Being invited to take part in another prestigious European project proves that off-site energy renovation is gaining traction. However, our country is still lagging behind when it comes to energy renovation. I hope our selection also shows our governments that off-site construction is the future of large-scale, sustainable energy renovation.” Michael De Bouw, head of the Renovation & Heritage laboratory at Buildwise, concludes: “The ‘off-site construction’ approach to renovation is one of the keys to delivering a large-scale renovation wave using high-quality, in-depth renovation techniques. This requires not only technical challenges to be addressed, but also market and organisational issues, so that the sector can invest and scale up to ensure these practices take hold across the Belgian construction industry.”
Question about this story? Ask your question
In this story
- Project:renovatie van 160 sociale woningen
- Location:Wattrelos (FR)
- Partners:BuildUp, Vilogia, Septalie, NORTEC Ingeniérie, Symoé, REDCAT ARCHITECTURE, Rabot Dutilleul Construction en Pouchain SAS
Keep following this
Get an email when a new story is published. No account needed.
- ThemeGiving existing buildings a new future
- SubjectProjects















