Projects

Dancing between concrete and orchard

Text Petra BroedersImage Beeuwsaert Construct

Dancelot verschijnt als gitzwart silhouet midden in een uitgestrekte parktuin.
Dancelot verschijnt als gitzwart silhouet midden in een uitgestrekte parktuin.

Precision prefabrication, built for creativity and connection

You could almost miss it, tucked away in the greenery on the outskirts of Bruges. Until your eye is caught by a jet-black silhouette in the middle of an expansive park garden. Not a conventional dance school, but a perfect pas de deux between raw architecture and lush nature. Here, Charlotte Vander Zande and Michel Deveen realised their dream. And with Beeuwsaert Construct as main contractor, every phase of the build unfolded like a flawlessly rehearsed choreography.

After organising dance classes at various locations in Bruges for twenty years, Charlotte Vander Zande and Michel Deveen decided to bring everything together in one place. “We wanted a building that would stimulate creativity, be functional and feel warm,” says Michel. They found the site on the grounds of a former horticultural business in a green sports and recreation zone. They turned to Compagnie Costume for the design, and Beeuwsaert Construct for the structural work and prefabrication.

“What convinced us? Beeuwsaert Construct builds industrial premises, but always with a certain ‘cachet’. Not anonymous boxes, but buildings with character and a high-quality finish,” says Michel. “The fact that they had also worked on De Halve Maan brewery in Bruges, as well as large industrial premises, gave us confidence.”

Beeuwsaert Construct showed great respect for the existing flora.
A rooflight and staircase create a connecting space.

Tight schedule, smooth delivery

Beeuwsaert Construct was responsible for the technically complex prefabrication process, with a tight deadline: the dance school had to be operational by September 2024. “We started work on the technical 3D model in November 2023, the ground slab was poured just before Christmas, and from January onwards everything moved incredibly quickly: the precast structures were up in just eleven days,” Michel recalls. 

The speed of the prefabrication process went hand in hand with attention to detail. “Beeuwsaert Construct actively contributed ideas on the positioning of joints, grooves and service connections. For example, they deliberately placed the grooves in the concrete panels on the outside, so the interior spaces would retain a clean, uninterrupted look.”

A staircase that brings people together

The building comprises two volumes: the reception area and the dance studios, linked by a rooflight and a staircase. The rooflight is not just an aesthetic feature, it is functional too: it brings in natural light and guides dancers through the building in an organic way. “It is a connecting space, not just between the volumes but also between the dancers. During breaks, they often linger here to chat or catch their breath,” says Michel. 

Installing the colossal staircase was quite an undertaking. “That moment will always stay with me. The staircase was lifted into place by crane, then had to be manoeuvred precisely between the walls that were already in place, without damaging them. A real feat of skill.”

The building comprises two volumes: the reception area and the dance studios.

Architectural harmony between inside and out

Inside, the atmosphere is industrial, with black steel structures, polished concrete floors and exposed building services. At the same time, timber accents and carefully chosen colours give the whole space a warm, homely feel. “We had everything finished in black, including the pipes, windows and handles, and added timber for balance. This creates a sense of robustness and comfort.”

One of its greatest assets? The setting. The dance school is fully integrated into a redesigned orchard, now a park garden featuring several ‘wild garden rooms’. “Beeuwsaert Construct showed great respect for the existing flora,” says Michel. “The large summer oak was allowed to stay, the hedges were left untouched, and crane movements were deliberately kept to a minimum during construction.” The large windows in each studio frame the landscape and bring the greenery indoors. 

Large windows bring natural daylight inside.

Accessibility and future-proofing

The building is completely step-free and fully accessible, following consultation with Inter, the Flemish accessibility expertise centre, and with support and funding from both Sport Vlaanderen and Stad Brugge. “Beeuwsaert Construct also contributed actively on this front,” says Michel. “They ensured that every finished floor level was correct and that the technical work closely met the accessibility requirements.”

And what about the final finishing touches? “As with any construction project, there are still a few minor snagging items, but Beeuwsaert Construct deals with them straight away, even outside working hours, so our classes are not disrupted. I really appreciate that commitment. Klaas Pil, our project manager, was worth his weight in gold. I couldn’t have wished for anyone better.”   

Have a business enquiry for Beeuwsaert Construct? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeDesigning green and outdoor spaces
  • SubjectProjects
  • CompanyBeeuwsaert Construct
Share this article

Follow on ArchiComm Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.