“Then I’ll huff, and I’ll puff, and I’ll blow your house down”

In the popular imagination, the wolf from The Three Little Pigs is still lurking. The wooden building is blown away, while the stone building stays standing. This still feeds the idea that timber buildings have a shorter lifespan. Since the choice between one construction method and another is made at a very early stage, it is often driven by this conservative reflex.
Since completing my first work placements in Munich, where timber construction was considered mainstream, even for larger projects, I have been challenging this scepticism. I turn to this construction method first and foremost because making the construction industry more sustainable must make a significant contribution to the fight against climate change. Timber construction is an important part of that.
Since 2006, the focus has been on buildings’ ‘operational’ CO2 emissions, following the introduction of EPB. As EPB requirements become more stringent, the ‘embodied energy’ of buildings is becoming more important. Embodied energy describes the emissions associated with construction itself. All materials used carry a hidden cost for people and the environment, one that is not reflected in the price. This cost can be reduced by reusing materials or using renewable materials with lower CO2 emissions.
But conventional solid construction offers limited scope for circularity. Heavy, energy-intensive construction materials are cast, glued or mortared together, on the assumption that the building will then remain in use for hundreds of years. Life-cycle thinking is limited to devising a flexible floor plan. At the same time, we are demolishing buildings from the post-war period because they cannot be renovated to meet current housing standards. The masonry waste is then crushed and ‘recycled’ as road sub-base. This logic makes little sense.
Timber construction, and timber frame construction in particular, offers a unique opportunity to drastically reduce both the weight and emissions of the structure, and to connect its components in a reversible way. If the building falls into disuse and is demolished, even after a lifespan of hundreds of years, its components can be unscrewed and reused in their original form with minimal damage.
Secondly, I would argue that the scepticism mentioned above is unfounded. Today, structural stability requirements for wind loads take much more into account than the lung capacity of a fairytale wolf. Nevertheless, it is essential to realise that building with timber entails different risks. It is a specialist field in its own right. Inaccurate execution can significantly shorten the structure’s lifespan, negating the benefits listed above. Greater attention to condensation and water ingress, summer comfort, acoustics and fire resistance is essential. That is why I also advocate extensive prefabrication, with the sophisticated workshop of the timber contractor providing controlled conditions in which to assemble all the elements. On-site assembly can then be reduced to a minimum number of rain-free days. The limited disruption to the neighbourhood is an added bonus.
Finally, I advise clients to follow the example of the Brussels housing association, which published several tenders in 2017 for design & build proposals specifically for prefabricated timber construction. The combined expertise of contractors and designers provides immediate budget certainty, as well as a guarantee of a building fit for the future. I hope many more courageous clients will follow this example.
Arthur Van Cauwenberghe,
Architect-engineer and partner at Abscis Architecten