Efficient and reliable bonding of façade panels
Text Lieke BousemaImage Bostik

Façade panels are becoming increasingly popular. Not only because of their durability and energy benefits, but also because they are easy, quick and clean to install. “What’s more, façade panels make it possible to create a high-quality, seamless building façade,” says Free Van hulle, Technical Account Manager Façade at Bostik. “Our PanelTack panel bonding systems are designed to support 10 times the weight of the panel. They also accommodate cyclic expansion and contraction caused by environmental factors such as wind, temperature and humidity. This ensures a durable bond for high-pressure laminate (HPL), aluminium composite materials (ACM), pressed mineral wool (PMW), fibre cement board (FCB), ceramics and other materials under all conditions.”
Bostik offers a unique range of products for bonding façade panels, all tested and certified in accordance with European Technical Assessment (ETA) 004:2000. This means Bostik adhesives can be used without additional mechanical fixings, saving both time and money.
Bonding façade panels offers significant advantages over methods such as screwing. One key benefit is concealed fixing: once installed, no screws or cover caps are visible. There are also no dirt streaks, and stress concentrations that can cause breakage are avoided. As façade panels are bonded to vertical battens on a vertical support structure, stresses are distributed far more evenly. There are no point loads of the kind created by screws. This also makes it possible to bond thinner panels (>6 mm) without the risk of breakage or cracking.

A perfect bond in just a few steps
For more than 30 years, Bostik has been a leading name in façade cladding and panel bonding with its PanelTack system, which ensures reliable bonding of wall panels, façade cladding systems and external insulated façade panel systems.
If the timber or aluminium substructure of the façade and/or the façade panels are heavily soiled, Bostik recommends using a PanelTack cleaner. “The primer can then be applied,” says Van hulle. “Each type of façade panel requires a specific primer, as well as a specific adhesive. The primer’s main purpose is to clean and prepare the substructure for bonding, ensuring the best possible adhesion.”
As with the substructure, primer is also applied to the back of the façade panels. “The primer must be applied in vertical strips 10 to 15 centimetres wide, corresponding to the dimensions of the vertical battens on the substructure. Foam tape must also be fitted to the support structure. It acts as a 3 mm spacer and provides initial adhesion. The adhesive can then be applied. Bostik recommends a 9x9x9 mm triangular bead, formed automatically by the shape of the nozzle when the adhesive is applied at right angles.”
Three panel types, three adhesive systems
Stone wool board, HPL and fibre cement board façade panels each have their own specific properties, Van hulle emphasises. “Their thermal and hygric movement, meaning expansion and contraction caused by temperature fluctuations and humidity, varies. That is why these panels require specific adhesive systems with a particular degree of elasticity. This helps accommodate deformation of the façade panels, for example. Bostik offers three adhesive systems for this purpose, Paneltack, Paneltack S970 S and Paneltack HM, together with the corresponding primers. A major advantage of these systems is the limited number of application steps. There is no need for intermediate steps such as cleaning and wiping dry, saving installers considerable time.”

Bostik Academy
Bostik supports professionals in the bonding industry with project start-up and the preparation of work plans. Account managers advise on the right products for each project and panel type. Practical training is also provided through Bostik’s distribution partners, covering the correct application of the products, the curing process and how to avoid common mistakes.
Product and project warranty
In addition to the statutory product warranty, Bostik can also provide a project warranty for projects of 150 m2 or more. This warranty is based on comprehensive support throughout the project. From project start to handover, Bostik checks the drawings, advises on the right products and provides training in their correct application. The site is also inspected 3 times to identify any questions, check that all product instructions are being followed and determine whether any adjustments are needed. Every application step is carefully documented and collated in a file, which is handed over to the client once the project has been reported as complete, together with a warranty certificate. The standard project warranty is 10 years.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeBuilding envelopes for a changing climate
- SubjectRoofing & facades