Infiltration need not be a stumbling block

Text and images ArtStone

Opbouw met FluvioStone en waterdoorlatende ArtStone Aqua klinker in lineair verband.
Opbouw met FluvioStone en waterdoorlatende ArtStone Aqua klinker in lineair verband.

Meeting the new GSVH requirements with innovative storage blocks

Since the new rainwater regulations came into force in October 2023, many architects have occasionally found rainwater drainage a stumbling block in their projects. It is not so much the integration of a rainwater harvesting tank, but above all the requirement for sufficient infiltration capacity on site that has caused problems with designs or planning permission in recent years. Yet, with permeable paving now explicitly recognised as an underground infiltration facility, and with the help of innovative storage blocks such as the patented and multiple award-winning FluvioStone, it need not be difficult.

The new Regional Urban Planning Regulation on Rainwater, known as the GSVH, represented a significant tightening of the rules in October 2023 compared with the 2013 regulations. The regulation now applies not only to new-build and reconstruction projects, and to the installation, replacement or extension of paved surfaces of 40 square metres or more, but also to works subject to notification or planning permission on smaller areas, including renovations involving drainage works. In addition, an infiltration facility is now mandatory for plots of 120 square metres or more, down from 250 square metres.

FluvioStone storage blocks are easy to install, at just 30 centimetres below ground level. This means the system is always above the groundwater level.

Focus on infiltration

On-site infiltration is the hallmark of the new GSVH. Along with lowering the threshold to 120 square metres, the minimum infiltration area and minimum volume have been raised to eight per cent of the drainage area (previously four per cent) and 33 l/m2 of drainage area (previously 25 l/m2), respectively. As for the type of infiltration facility, since 2023 there has been an explicit preference for above-ground systems such as swales and infiltration basins. The combination of all these more stringent requirements can make it difficult to arrive at a concrete design that will obtain planning permission.

Although the new GSVH explicitly favours above-ground infiltration systems, underground systems are not necessarily ruled out. Underground infiltration is permitted where above-ground infiltration is not possible for technical or legal reasons, provided clear justification is given. Typical reasons for choosing underground infiltration systems include lack of space, the need for or presence of an impermeable paved surface, avoiding pump installations to direct run-off rainwater to an above-ground facility (for example, on a sloping site), or minimising the removal of soil that may be contaminated.

Infiltration through permeable paving

An important addition to the latest version of the technical background document is the explicit recognition of permeable paving as an underground infiltration facility. This means that, subject to the necessary justification and provided the entire build-up meets requirements including those for permeability, the horizontal projection of the permeable surface counts as the infiltration area. The storage volume counted is the actual available volume. In other words, it depends greatly on the system build-up.

The basic build-up of the FluvioStone system.

The added value of a storage block

ArtStone, a specialist in paving for driveways and patios, offers FluvioStone as a way to optimise permeable paving in both private and public projects. The storage blocks produced by ArtStone can increase the available storage volume beneath the paving by as much as 100 l/m2. FluvioStone blocks feature a large cavity for storing rainwater and are made from porous concrete, allowing water to infiltrate slowly into the ground. The basic build-up therefore provides a storage volume of more than 150 l/m2 and an infiltration area of 100 per cent: enough to infiltrate not only water from the paving itself, but also the overflow from the rainwater tank and any green roofs through the permeable paving. The system can also be used in flood-prone areas, where storage and infiltration requirements are even more stringent.

A straightforward solution

The substantial additional storage volume that FluvioStone can provide is matched by its minimal impact on the project. The storage blocks are easy to integrate without modifying the paving build-up. Their low height and position just 30 centimetres below ground level mean the system is always above the groundwater level, enabling highly efficient infiltration. In addition, little excavation is required, and the choice of finish is entirely open, making it easy to meet the project’s aesthetic and technical requirements.

ArtStone also provides comprehensive support. All specification texts, technical data sheets and calculation tools are available online, and the technical team can also provide personal guidance where needed, from the initial calculation through to liaising with local authorities and preparing the justification. This makes the route to planning permission considerably smoother.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectExteriors
Share this article

Follow on ArchiComm Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.