Exteriors

A sleek commercial building for a lighting manufacturer

De stalen wenteltrap is de eyecatcher in het interieur.
De stalen wenteltrap is de eyecatcher in het interieur.

Letting the products speak for themselves

Roeselare-based lighting specialist 100% LIGHT set out to find a new building that would make its products shine even brighter. Thanks to its thoughtful design, material choices and interior finishes, the building brings out the modern, sustainable and detail-focused character of the products. Main contractor Beeuwsaert Construct carried out all the structural work.

100% LIGHT offers lighting fixtures with designs that are as sleek as they are functional, for residential, commercial and outdoor applications. The company has since grown into one of the sector’s leading businesses, exporting its fixtures to more than eighteen countries. To keep pace with its rapid growth, it was looking for a new headquarters that would reflect the modern, sustainable and detail-focused character of its products. 

The façade reflects the modern character of 100% LIGHT’s products.

An impressive design as the starting point

Brussels-based architecture firm Epure designed a contemporary showroom, office and production hall, and loading bays with provision for an overhead crane. The building is a striking landmark along the Roeselare ring road. The Ledegem-based firm Beeuwsaert Construct, which specialises in prefabricated industrial construction, was appointed to carry out the building work. “The architects’ plans were naturally our starting point,” says project manager Mathias Despriet. “We optimised them and translated them into a 3D structural model, paying close attention to the materials and stability. Steel was obviously the right choice of building material. Among other elements, the hall’s structure comprises IPE 300 and IPE 600 columns, as well as three trusses with a 33-metre span, welded in the workshop and assembled on site. The frame contains around 124,500 kilograms of S235JR and S275J0 grade steel.”

Steel elegance

The floating box-in-box structure housing the offices and showroom uses a minimum number of galvanised columns. These are fabricated sections, chosen to emphasise the project’s slender appearance. The office appears to slide out of the warehouse, allowing the glazed entrance hall to take centre stage. The façades are clad in black ArcelorMittal Promisol 5100 insulated sandwich panels. To improve the acoustics in the production hall and offices, perforated galvanised steel decking by Joris Ide was chosen. The roof deck is topped with a vapour barrier, insulation and roofing membrane. The cantilever, which rests on the steel structure, is made of wood. The cladding around the frame consists of Alucobond panels, a composite panel made up of two aluminium sheets with a mineral-filled polymer core.

The timber cantilever rests on the steel structure.

A spiralling centrepiece

Inside the entrance hall, the steel spiral staircase is the standout feature. It was designed and built by Ben Broes and Jakob Lefevre. The staircase, 5,390 millimetres high, with a radius of 2,300 millimetres, a diameter of 4,600 millimetres and a weight of 2,500 kilograms, is made around a central untreated steel tube measuring 508 millimetres in diameter, 10 millimetres thick and 5,390 millimetres long, with a base plate. This was chemically anchored to the foundation beneath the polished concrete floor. To install it, a 750-millimetre hole had to be drilled in the floor. The 23 steps, made from 6-millimetre blue flat steel, grade S355, are bent into a U-shape.

A committed building contractor

Beeuwsaert Construct delivers around 160 projects a year. Its sites are spread across Belgium, as well as northern France and the southern Netherlands. As a Class 8 contractor, the company takes care of the entire project. Close contact with the client is always central to its approach, ensuring that their requirements are met as fully as possible. The West Flanders family business has added another fine project to its portfolio with 100% LIGHT.    

Have a business enquiry for Beeuwsaert Construct? Get in touch

In this story

  1. Project:100% LIGHT
  2. Location:Roeselare
  3. Architect:Acb Epure Architects
  4. Photographer:Klaas Verdru
  5. Also involvedBeeuwsaert Construct

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeLight and sound as design tools
  • SubjectExteriors
  • CompanyBeeuwsaert Construct
  • CompanyJoris Ide
Share this article

Follow on ArchiComm Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.