A fire station is much more than a depot for vehicles and equipment. It is also a working and resting environment for staff who spend long shifts there, by day and by night. At the new fire station in Bruges, that calls for insulation that meets both everyday use and the technical building requirements. For the façades, the choice fell on URSA WALLTEC BLACK, with attention to thermal performance, non-combustibility and the conditions during construction. In this video, the fire service, contractor Artes, dealer Isobuild and URSA explain which considerations determined the choice of material and how consultation and timely deliveries support the works.


Have a business enquiry for URSA Benelux? Get in touch
Full transcript
Read the full transcriptCollapse transcript
Kim Joos: URSA
00:01 WALLTEC BLACK is a glass wool board for façade insulation, faced on one side with a black glass tissue. This insulation provides acoustic comfort and adds thermal insulation value. The board is also non-combustible, with reaction-to-fire class A1.
00:16 All these factors together make our WALLTEC BLACK indispensable for the fire station.
Laurence Deman: Fire service
00:23 The improvement this new station brings is certainly its location, which is much better placed in relation to the access roads. This means our response area can be reached faster. A comfortable working and resting environment is very important.
00:35 We work twelve-hour shifts here, including at night. It is pleasant to be able to spend time here in a homely atmosphere.
Jürgen Teerlinck: Isobuild
00:42 We delivered 2,900 square metres of WALLTEC BLACK here. To ensure deliveries run on time, good communication between the site management on one side and our internal sales office on the other is of great importance.
00:55 We faced three challenges here: the height of the building, the long open time and, of course, meeting the specification. WALLTEC BLACK meets all three requirements perfectly and is therefore the solution for the insulation of this project.
Ruben Defoort: Artes
01:10 First, there was a requirement for the R-value: we had to achieve 5.15. In addition, there were a non-combustibility requirement and an ecological requirement for the insulation. In consultation with Isobuild, we received a proposal for WALLTEC BLACK.
01:24 In terms of price, that was an attractive proposal for us, so we went ahead with it.
Who worked on it
Brandweerkazerne Brugge in Brugge
- facade insulation
URSA - contractorArtes
- dealerIsobuild
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBrandweerkazerne Brugge
- ThemeBuilding envelopes for a changing climate
- SubjectRoofing & facades
- CompanyURSA Benelux
- CompanyArtes
- CompanyIsobuild