Projects

WALLTEC BLACK helps E. Rombaut simplify fire protection insulation

WALLTEC BLACK helps E. Rombaut simplify fire protection insulation

The striking outline of the Kaai 33 project rises along the Dendre in Aalst. This residential development comprises 29 homes in a spectacular architectural setting. Construction is taking place in a challenging context, with sharp price fluctuations and new fire safety requirements on the horizon. WALLTEC BLACK has proved an invaluable partner for the construction team in tackling these various challenges.

Kaai 33 is set to become a landmark on Aalst’s new ‘ramblas’

In collaboration with the City of Aalst, developer Vestra, architecture practice ESTE and contractor E. Rombaut are writing a new chapter in the history of the quays in this industrial city. The Kaai 33 project marks the start of the transformation of the route linking the municipal park and the city centre along the Dendre. To meet their commitments to sustainability and fire safety for Kaai 33, the designers chose URSA’s WALLTEC BLACK insulation.

The Kaai 33 building takes shape like a ship that has just moored on the banks of the Dendre. These poetic words open the virtual tour on the website of the new residential project. The visualisations leave little to the imagination and confirm a robust architectural design that gives the former industrial site on the Dendre a distinct identity. “That was also the starting point for our concept,” explains Peter Flamend, partner at ESTE Architects. “In response to the PES ‘Extension of the Municipal Park’, we developed this concept in close collaboration with the City of Aalst. Our vision for the project is to pay tribute to Aalst’s industrial past. This is reflected in raw construction materials such as red brick, large concrete paving slabs and metal cladding on the upper floors. These upper levels not only mark the end of the building, but also create a clearly recognisable landmark when entering the city.” Kaai 33 is the first project in a new development plan between the municipal park and the city centre. In a later phase, the city will redevelop the quays with the aim of turning them into a ‘rambla’ linking the city’s two main attractions.

Fire safety made simple

Kaai 33 sets new benchmarks not only for architecture, but also for sustainability, thanks to its strong energy performance and choice of quality materials. ESTE Architects chose mineral wool to insulate the external envelope. “For two reasons,” says Peter Flamend. “First, sustainability. At ESTE Architects, we are not particularly keen on chemical insulation materials, which are also not recyclable. Second, fire safety. In view of the stricter requirements for façade insulation set out in the new Royal Decree on fire safety, we looked for an insulation solution that would not require compartmentation within the insulation layer of the external façade. This choice makes coordinating the work of the various contractors much simpler. That is why we opted for mineral glass wool.

A promising first experience

On the recommendation of building materials supplier Van Biesen: Everaert, contractor E. Rombaut opted for URSA WALLTEC BLACK. Site manager Gunter Vereecken has completed the supporting structure and is currently installing the façade insulation and facing bricks. “This is the first time I’ve worked with 18 cm-thick WALLTEC BLACK,” he admits. “It’s a straightforward insulation system to install. We secure the boards with anchors. An embedment depth of 6 cm is normally sufficient, but as 24 cm anchors are almost impossible to find on the market at the moment, we’re using 26 cm ones. The advantage of this flexible insulation is that it easily accommodates irregularities in the supporting structure. With rigid insulation boards, you always have to cut them to get a perfect fit. The insulation does need to be well protected from the rain, though. That does concern me a little. Apart from that, this first experience has gone smoothly.” The insulation is protected by red brickwork. “One striking feature of the work is the vertical stretcher courses that finish each storey. They account for some 600 m² out of a total of 1,800 m² of brickwork.”

Forward-thinking procurement

Frederik Van Biesen remembers the request from contractor E. Rombaut clearly. “Our first discussions took place at the end of 2021. The priorities were a sustainable material that would easily meet the new fire safety requirements and, above all, offer a degree of price stability. Our main challenge was to provide the same R-value as PIR insulation without too much of a difference in thickness,” explains Frederik van Biesen. As a result of this proposal, the supplier was awarded the contract for the project’s entire insulation system, including accessories. “The contractor also played it safe by ordering some of the insulation in advance and storing it on site. This allowed him to get ahead of the current uncertainty around prices. We’ve worked with this contractor for several years and we also keep plenty of materials in stock, which means we can deliver quickly.”

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRenovating without erasing heritage
  • SubjectProjects
Share this article

Follow ArchiComm Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.