Texte : Eva Goossens | Photos : Marble Moon/Adaptief

Although the saying goes that we have a brick in our belly, timber construction is gaining ground. Building with solid CLT panels (Cross Laminated Timber, or cross-laminated timber) in particular is booming. We had the opportunity to speak to architect Laurent Vanhaverbeke of Adaptief, a young sustainable architecture practice that dares to create designs with an ecological outlook, about the opportunities and advantages of this method, as well as its challenges and possible solutions.

Living consciously in harmony with nature, in a sustainable home with a contemporary look. That was the brief given to Ghent-based architecture practice Adaptief by the client for this recently completed CLT home in Aalbeke. Behind Adaptief are Laurent Vanhaverbeke and Florence Desmedt, who have been following their own path for two years now. Their practice focuses on ecological and sustainable architecture, guided by a highly developed understanding of climate and society. To this end, they adopt an adaptive design strategy that addresses climate challenges and makes maximum use of ecological, bio-based building materials. Timber construction fits perfectly into this approach.

Timber construction: a matter of sustainability and aesthetic value
There is no need to prove that timber construction, naturally using FSC-certified timber from well-managed forests, is a sustainable choice. This natural, renewable material is also an excellent insulator. As well as being lightweight and strong, it emits only small amounts of nitrogen. As Laurent explains: «What’s more, CLT homes can even be seen as CO2 storage buffers. A tree absorbs CO2 from the atmosphere, which remains stored in the building timber even after the tree has been felled.» Timber also has a positive effect on the living environment, while CLT offers design and aesthetic advantages. «Compared with timber-frame construction, the CLT method allows much slimmer structures,» Laurent adds. Another advantage is that, indoors, the timber itself serves as the finish and does not generally need to be painted, coated or plastered to achieve an attractive result. Laurent continues: «CLT is made from pine, which can turn yellow when exposed to UV rays. If the client wants to prevent this discolouration, we opt for a bleaching treatment to achieve a lighter, more subtle result. But you can also choose a darker shade, for example to create a feature wall. The possibilities are numerous.»

Weighing up the pros and cons
What are the drawbacks of building with CLT? CLT performs slightly less well acoustically, although this is mainly an issue in multi-unit housing. Laurent explains: «In a single-family home, CLT provides sufficient acoustic comfort, but we still provide acoustic decoupling between the different floors.» Another point to consider is, of course, the price. Timber construction has a reputation for being more expensive. «Building materials do cost more, but you can make savings elsewhere. Ultimately, the final construction cost is more or less the same as that of a traditional home. Savings can be made above all on finishes, by leaving the CLT exposed indoors. We can also keep material and transport costs under control by making appropriate design decisions, always in consultation with the contractor. Very large panels may require additional or more expensive transport, which we try to avoid. Smaller panels, on the other hand, require more assembly work. We have to weigh up the pros and cons.»

Fast construction
This naturally brings us to a major advantage that helps reduce the cost of CLT construction: speed of construction. «In around five weeks, a single-family home built with CLT can be made weather-tight. As soon as we know the window delivery time, we draw up a schedule and coordinate the construction accordingly.» Preparatory work is, of course, somewhat more extensive and intensive for the architect. When building with CLT, all the technical systems must already be taken into account at the design stage. Does this requirement limit flexibility? «There is little room for discussion or error on site. Every detail is determined in advance, including the electrical installation and lighting. Everything is incorporated into the BIM model, which enables us to draw up the final CLT plan, after which the timber is milled directly. This approach naturally requires intensive consultation beforehand. But it also reduces stress, both for the client and the architect. Everything has to be decided in good time. That doesn’t mean no changes can be made on site. Adding a socket is no problem, but changes are limited.»




An unreserved love of timber
This home in the Kortrijk area combines sustainability with modern comfort to create a home with character. For insulation, the outside of the CLT walls was fitted with a non-load-bearing timber frame filled with wood-fibre insulation. «We always choose ecological, vapour-permeable insulation materials, such as wood-fibre insulation or cellulose flakes, hemp-lime insulation or cotton-based insulation,» Laurent adds. The roof construction is distinctive: the architect used the Novatop Elements ceiling and roof system, which made it possible to avoid using a ridge beam. These modules can be filled with insulation and have an interior finish comprising a thin layer of CLT, creating a consistent look throughout the home. Laurent explains the choice: «Standard CLT wasn’t an option here because of its weight. We have to take into account the considerable force exerted by the two pitched roof planes on the external walls. Using a lighter hybrid roof structure brings function and clean aesthetics together.» For the façade cladding, the client chose the Shou Sugi Ban technique, or charred timber technique. The double-height living area is closely connected to the outdoor spaces through the huge windows and glazed folding door. Another smart feature is the asymmetrical canopy, finished inside with thermally modified pine. It not only prevents overheating in the height of summer, but also provides an elegant finishing touch to this archetypal CLT home.
PROJECT DETAILS
Project: CLT construction archetype
Location: Aalbeke
Architects: Adaptief, sustainable architecture practice
Question about this story? Ask your question