The art of building has become a complex score involving a host of players. Among them is the prospective builder. For twenty years, BEE architect has sought to involve them in composing that score, encouraging them to take ownership of the work and ultimately arrive at the best possible project. Even, and perhaps especially, when this means looking at the original project from a completely different angle.

For around twenty years, the Beez-based architecture practice BEE architect, in the Namur region, has brought its vision and passion to a wide variety of projects, from public and industrial buildings to property development and private commissions. “Recently, we’ve noticed that heritage renovations, with a focus on comfort, compliance and energy performance, are becoming increasingly common in our work,” says Philippe de Menten. “But whatever the project, our approach always starts with listening carefully to the client. We encourage them to be curious and to step outside their comfort zone, so they can see the reality of the project from a different angle. It is important to understand the issues at stake. And the prospective builder is often unaware of them, or does not have a clear grasp of their needs,” he explains. 

Aircraft assembly hall. Copyright: Philippe de Menten. (42917)

“Our approach to a project tends to prioritise simplicity, expressed through the architecture, materials, building layouts and the use of technology. Above all, simplicity means not building what we can share. We focus our efforts on organising how spaces are used as needs change over time: in a school, a library can also serve as a computer room; in a house, a playroom might later become a TV room, an extra bedroom or an office,” explains Philippe de Menten.  

Several options are then put forward to cover as broad a range of constraints and opportunities as possible. Once the guiding principle has been established and the project approved, the next step is to address all those constraints, which are often highly complex. This calls for a rigorous working method, based on meticulous monitoring and respect for the work of everyone involved.

Energy renovation and heritage. Copyright: Philippe de Menten (Maredsous)

A pivotal period

“A building does not have just one life, the one it was designed for. It has several,” says Philippe De Menten. A building’s use can indeed change over time, following a change of ownership, the cessation of activities or a reduction in the space occupied. In other words, creativity is needed here too.  

“This changing context places us at a pivotal moment, shaped by numerous constraints and indicators that are constantly changing. It is not one environment but several that are in flux. First and foremost, energy and EPC regulations, with the explicit aim of achieving carbon neutrality by 2050. Each region adopts different laws, while keeping an eye on what is happening elsewhere. Our clients have to make choices that will commit them for 30 to 40 years, without knowing what regulatory or tax requirements will apply in the years ahead. It is a real conundrum for the architect advising them,” he tells us. 

“For example, Flanders recently introduced a requirement to reach energy performance class D whenever a property changes hands. But what will the requirement be in a few years? Will properties have to reach class C, B or even A? This is complicated if a prospective buyer wants to keep their property for life. If class A is then required, they will have to consider whether a major renovation or demolition followed by new construction is the better option. Demolition runs counter to decarbonisation because it discards resources that have already been processed and used. What is more, converting an old building into a new one is extremely expensive, costing significantly more than building new and requiring the investment to be amortised over several decades. At current energy prices, such an investment cannot be paid back. 

Duplex homes. Copyright: Philippe de Menten (maiWSL)

The second environment undergoing major change is the cost of raw materials and labour, both of which have risen sharply. The third area is spatial planning, where management lacks consistency. It is a maze of local laws and regulations that vary according to the municipality, the political majority or the officials in charge. This considerably lengthens the time it takes to obtain a permit. There is no qualified arbitrator to guide us through the legislative tangle and make informed decisions when laws contradict one another. Under the current system, prospective builders have to spend heavily on preliminary studies to obtain a written opinion from the authorities that binds them. In most cases, they have to apply for a permit just to find out the authorities’ official position, via a refusal. This is a considerable waste of time, which is now reflected in construction costs,” Philippe de Menten says. 

“In this complex context, the creative phase is essential. It must lead to a project that brings all parties together in a shared account of the future of the site in question. Through their designs, architects tell a shared story that is bigger than themselves. That is the beauty of the profession,” concludes Philippe de Menten.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow ArchiComm Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.