After six years of refurbishment, Neptumium swimming pool in Schaerbeek has reopened to the public. Bespoke aluminium profiles have been installed. First opened in 1957, the pool has undergone a complete transformation while retaining the clean lines of its original modernist design.
Deforche Construction: Forzon (a subcontractor to Strabag) designed the entire façade and glazed roof, while respecting the building’s architectural value. The primary steel structure was retained, with a new aluminium and glass structure installed over it. Aliplast, a manufacturer of bespoke aluminium profiles, was selected as the supplier for the project. The choice of Aliplast was an obvious one, given its experience since 1984 in developing and producing aluminium profiles, including extrusion, powder coating and thermal break assembly, all carried out in-house. This fully in-house production not only ensures a high level of expertise and in-depth product knowledge, but also fast, reliable and high-quality delivery.

“What sets us apart from our competitors is that everything is done in-house. This allows us to respond quickly to customers’ needs and meet short delivery times. It is a considerable advantage in today’s construction industry, where time is crucial to making a building wind- and watertight,” says Alexander Morel, project support manager at Aliplast.
Originally built in 1950 and inspired by the 1930s “Paquebot style”, Neptumium swimming pool presented an architectural challenge for Aliplast. However, the team embraced the complexity of the project, with its clean horizontal lines and repeated forms reminiscent of the bow of a large ship.


One of the challenges was the surface treatment of the profiles, as the pool is a demanding environment with high chlorine levels. The specific 9-metre length required for the roof construction profiles, and the architect’s wish for a concealed opening sash, called for careful consideration and precise solutions.
Aliplast delivered within a very short timeframe and also provided technical support for the project. The result is a source of pride for the Aliplast team, which proved its capabilities on this project. Its success has encouraged Aliplast to develop further and take on other equally ambitious projects, building on its outstanding achievements over the past 20 years.